|
What type of installation method is required ?
What is the nailing schedule (how far apart are the nails
placed) or what type of adhesive is needed (always use manufacturers
adhesive products-if not warranties may be voided).
Has the wood floor material been properly handled prior
to installation ? Has it acclimated at the job site( In
HVAC conditions- those that are normal for the area under
regular living conditions?).
Are the moisture contents of the wood floor products and
the subfloor compatible?
Whether you, your architect, builder, or designer helps
in the decision making about your wood floors, you must
do your homework. The following are additional details you
must consider, or have specified when knowing what hardwood
floor will be installed.
| Floated
-
usually 1/8" urethane foam sheeting or may be glued
directly to subfloor |
 |
| Glued
- using Manufacturers recommended adhesive
|
 |
Nailed
or Stapled (all 3/4" material) -
as per manufacturers nailing schedule
|
 |
Return to Specification Table |